Kourosh Mehin/DPI/VICGOV1 
22/02/2007 01:15 PM
To
Mary Jane/DPI/VICGOV1@VICGOV1
cc

bcc

Subject
Fw: General Report 7 - CRC-1 Well (Report attached)



Mary
Please for your record.
KM
Regards
 Kourosh Mehin
----------------------------------------------------
Dr Kourosh Mehin
Principal Petroleum Resources Advisor
Tel.:  (61 3) 9658 4416
Fax.: (61 3) 9658 4499
Mobile: 0419 597 010
 
----- Forwarded by Kourosh Mehin/DPI/VICGOV1 on 22/02/2007 01:15 PM -----
dsvco2crc@upstreampetroleum.com.au 
22/02/2007 11:45 AM	
To
dsvco2crc@upstreampetroleum.com.au, terry.greaney@bigpond.com, 
adelaidelam@upstreampetroleum.com.au, andres@iimetro.com.au, 
Andrew.Stobie@Halliburton.com, Edward.Bamborough@bakerhughes.com, 
BPrain@CenturyDrilling.com.au, bmorrison@melbourne.oilfield.slb.com, 
bassels@airnet.com.au, CMccoole@CenturyDrilling.com.au, 
cchagnon@perth.oilfield.slb.com, cbuskirk@perth.oilfield.slb.com, 
chris.boreham@ga.gov.au, DThompson@CenturyDrilling.com.au, 
dw@corpro-group.com, david.wong@dpi.vic.gov.au, 
dessyprananto@upstreampetroleum.com.au, 
duncannuttall@upstreampetroleum.com.au, DWAYNE.ROTA@woodside.com.au, 
elenaavrutis@upstreampetroleum.com.au, fee@premiumcasing.com.au, 
gavinfoo@upstreampetroleum.com.au, greghogan@upstreampetroleum.com.au, 
iblack@upstreampetroleum.com.au, IDunn@CenturyDrilling.com.au, 
ian@hofco.com.au, Ian.Mitchell@bakerhughes.com, Spikin@bigpond.com, 
Ian.Templeton@chevron.com, irinaheaver@upstreampetroleum.com.au, 
drillbits@ozemail.com.au, johnah-cann@upstreampetroleum.com.au, 
kasian@sale.oilfield.slb.com, kbruce@premiumcasing.com.au, 
kerstine@hofco.com.au, kourosh.mehin@dpi.vic.gov.au, 
ksitu@centurydrilling.com.au, vlot@perth.oilfield.slb.com, 
mascoli@premiumcasing.com.au, MARTIN.RICE@woodside.com.au, 
michelle.hendricks@dpi.vic.gov.au, marman@sale.oilfield.slb.com, 
nsantarelli@imdex.com.au, pkosarek@perth.oilfield.slb.com, 
pauljahn@upstreampetroleum.com.au, Paul.Korona@inteq.com, 
PMacKintosh@CenturyDrilling.com.au, peterjackson@upstreampetroleum.com.au, 
peter.aronetz@delosgaia.nl, philharrick@upstreampetroleum.com.au, 
philippkvashko@upstreampetroleum.com.au, 
rtwigg@melbourne.oilfield.slb.com, sharma2@slb.com, 
smewing@upstreampetroleum.com.au, terry.mckinley@dpi.vic.gov.au, 
Tim@lakesoil.com.au, eric.paerels@bp.com, Malcolm.Garratt@se1.bp.com, 
s.zarrouk@auckland.ac.nz, shassmann@chevron.com, trevormoo@chevron.com
cc

Subject
RE: General Report 7 - CRC-1 Well (Report attached)
	

	


 
 

From: DSVC02CRC 
Sent: Thursday, 22 February 2007 11:44 AM
To: 'Terry Greaney'; Adelaide Lam; andres@iimetro.com.au; 'Andrew Stobie'; 
Bamborough, Edward ; Ben Prain; 'Bevan Morrison'; 'Brian Assels'; Carolyn 
McCoole; 'Catherine Chagnon'; 'Chad Van Buskirk'; 'Chris Boreham'; Darren 
Thompson; Dave Whitby; David Wong ; Dessy Prananto; Duncan Nuttall; 
'Dwayne Rota'; Elena Avrutis; 'Fritz Enterweit'; Gavin Foo; Greg Hogan; 
Ian Black; Ian Dunn; 'Ian Hofmeier'; 'Ian Mitchell'; 'Ian Spikin'; 'Ian 
Templeton'; Irina Heaver; 'Jim Stobie'; John Ah-Cann; 'Kasian 
Sintoovongse'; 'Ken Bruce'; kerstine@hofco.com.au; 
kourosh.mehin@dpi.vic.gov.au; ksitu@centurydrilling.com.au; 'Leen Vlot'; 
'Mark Ascoli'; 'Martin Rice'; 'Michelle Hendricks'; 'Muhammad Ali Arman'; 
'Nick Santarelli (AMC)'; 'Pam Kosarek'; Paul Jahn; 'Paul Korona'; 'Paul 
Mackintosh'; Peter Jackson; 'Peter N ARONETZ'; Phil Harrick; Philipp 
Kvashko; 'Rob Twigg'; 'Sandeep Sharma'; Simon Mewing; Terry Mckinley; 'Tim 
O'Brien'; 'Eric Paerels'; 'Malcolm Garratt'; 'Sadiq Zarrouk'; 'Steve 
Hassmann'; 'Trevor Moo'
Subject: General Report 7 - CRC-1 Well
 
I’m at rig today and don’t have access to my normal comms so am issuing a 
brief update from rig. Full reports tomorrow.
 
Rgds
Terry
---------------------------------------------------------------------------
------------------------------- 
 
 
1. Revised drilling program Rev 1 issued with changes to coring, logging, 
sampling, X nipple placement – please contact if you need copy.
2. CRC-1 completed core #1 (Pember Mudstone). Jammed after 3m. Recovered 
about 2.1m. 4 of 6 jets plugged. RIH to drill ahead (depth 920m).
3        Incidents last 24 hrs – none reported.
4        The best guess services schedule is updated below (duration & 
timing may change as evaluation program is finalized and drilling 
progresses):
 
- Next Core Point – February 23
- Mob of Prod Casing – February 25
- TD – March 4
- Logging – March 5
- Production Casing Job – March 8-9  (Premium Casing threads) 
- Rig Release – March 10
 
5,   Time Depth curve attached for reference & as an aid to forecasting
 
6.   Other equipment needed later in the well (eg running production 
casing, TD logging, etc) wont be mobilized until a little later based on 
when needed and point of origin (check with me first).
 
Site maps and other information such as freight forwarding address 
available on request
 
The e-mail address for wellsite supervisors will be 
dsvco2crc@upstreampetroleum.com.au 
Kevin Murphy can also be contacted on 0407 058 095 
Land lines have been installed and awaiting Telstra activiation (est Feb 
25).
Century’s site number is 07-3102 0158 (satellite line)
 
 
Regards
 
Terry Greaney
Upstream Petroleum – Onshore Drilling Project Leader (CO2CRC Pilot Project 
Ltd)
Mobile: 0416 001237 / Phone: 03-8625 8400 or 8625 8544 (direct)
e-mail: terry.greaney@bigpond.com  (preferred)
 terrygreaney@upstreampetroleum.com.au (alternate)
                 